Our Projects

2-75-inch-armament-rocket
Armament Rocket
MORE
rocket
Rocket
MORE
Sukoi parts
Certificates of Authorization
MORE
su30mki
Defence
MORE
T-10
T-10 Avia-Tor
MORE
x32
X-32
MORE
07082011043
Glider
MORE
UAV – Unmanned Aerial Vehicle
MORE
DSC05709
DM-34
MORE
helocpter g
Helicopter
MORE

LOOKING FOR SOLUTION IN AEROSPACE?

CONTACT ENGENIOUS AEROSPACE LTD

What We Can Offer

RESEARCH & DEVELOPMENT

Engenious Aerospace Ltd periodically undertakes various research and development projects to create new technology and to improve existing

READ MORE
DEDICATED TEAM

Team designated for you is dedicated to you and all your requirements 24/7 and will not be working on other solution so maximal concentration is on your requirements.

READ MORE
LATEST STANDARDS

With every requirement we check latest standards which we will implement in our work so we guarantee that our work is top notch by the latest standards.

READ MORE
Outer Space Mission

Opening up outer space has ushered era for astroid mining, space medicine, space tourism, developing new materials leveraging ecology of space. and other research programs

READ MORE

From Idea To Realization

consulting

Our engineering consultants provide engineering-related services such as design, supervision, execution, repair, operation, maintenance, technology, creation of drawings and specifications, and make recommendations to public, companies, firms and industries.

From idea to realization most important step is consulting so we can analyze every aspect of the solution you require.

Here is important that you state all your requirements and our team of engineers with a lot of experience will present you with the possible solution for your needs.

DM34 sketch

Planning (also called forethought) is the process of thinking about and organizing the activities required to achieve a desired goal.

Production planning is the planning of production and manufacturing modules in a company or industry. It utilizes the resource allocation of activities of employees, materials and production capacity, in order to serve different customers.

Different types of production methods, such as single item manufacturing, batch production, mass production, continuous production etc. have their own type of production planning.

1036

In this step our engineers and architects finish their design and blueprints with last feedback from you before starting the execution of the project. Material is being shipped ( if working remotely ) or stored in required quantities for further usage.

Workers are being given detail instructions and clearing any doubts with them on how thing are need to be done.

All tools is being prepared for shipping ( if working remotely ) and prepared for usage. In this step all is double checked so risk of large issue is minimal.

Root_00028

Execution is the step when solution is being finally built. Now workers step in take the control of the solution with constant supervising by team of engineers which are dedicated to project.

Since in previous steps everything is double checked chances to something goes wrong in this step are minimal and only what is required is time for the solution to be finished.

Our every project so far was finished right on time so there is no chance that the deadline is being passed. Here you can do only smaller changes to the project.

T10flying

This step means that your solution is almost finished and now again our engineers step in to do the final testing and fine tunes if required. Here every inch of the solution is being thoroughly testing for any inconsistencies and if there are any it needs to be fixed.

This is the step which can prolong project finish but in our  experience this was never the case.

During the execution step team is designing testing steps which are planned so everything can go smoothly and without any unplanned failures.

Facility -2

This step means that the project is finished and fully functional without the issue.

At this step you or your team will receive complete documentation on how to use solution together with certain amount of educational hours depending on the project complexity.

Beside on how to use documentation you will also receive list of possible issues, which can occur as a result of the exploitation and material consumption, with the explanation on how to resolve them in a safe and precise way.

Engenious Aerospace Ltd

logo_eal_-_copy_vectorized

logo_eal_-_copy_vectorized

logo_eal_-_copy_vectorized